James Lane Mechanical provided turn-key fire protection service for the North Texas VA Hospital in Dallas, Texas. A significant portion of the existing wet pipe sprinkler system utilized CPVC piping that was deteriorating and no longer met hospital code requirements for fire suppression system. JLM replaced all CPVC sprinkler pipe with schedule 40 steel pipe throughout the hospital. All work was performed after normal business hours as to not interrupt daily operation of the facility, and the sprinkler system was returned to 100% operation during occupied hours each day. The project was completed ahead of schedule, to the delight of a very satisfied customer.